Projects

Fekola

FEKOLA MINE
– MALI(1)(2)

  • Third quarter ("Q3") 2019 gold production was 112,321 oz
  • Q3 2019 cash operating costs(3) were $361 /oz sold
  • Q3 2019 all-in sustaining costs ("AISC")(3) were $642 /oz sold
  • Year–to-Date ("YTD") 2019 gold production was 335,567 oz
  • YTD 2019 cash operating costs were $378 /oz sold
  • YTD AISC were $626 /oz sold
  • Full-year ("FY") 2019 gold production guidance range is expected to be between 445 Koz - 455 Koz
  • FY 2019 cash operating costs are expected to be between $370 - $410 /oz sold
  • FY 2019 AISC are expected to be between $625 - $665 /oz sold
  1. Footnotes:
  1. The disclosure contains forward-looking statements. Refer to the Legal section of the website (click here) for caution regarding forward-looking statements and the basis for presentation of Mineral Reserves, Mineral Resources and other technical disclosure.
  2. B2Gold's production results and guidance are presented on a 100% basis.
  3. Refer to “Non-IFRS measures” in the Company’s most recently filed Management’s Discussion and Analysis (“MD&A”). Click here for MD&A.

Stay Connected

Stay connected with B2Gold by signing up for email updates